Timber-frame house 291 m², 13.6×23.6 m
Timber frameterrace

Specifications
Total area291 m²
Wall materialTimber frame
Dimensions13.6 × 23.6 m
Terraceyes
Plot widthfrom 20 mwith 3 m setbacks
How much it costs to build this house
Calculate it yourself: choose the plot location, foundation and construction stage. Primorye builders’ prices, November 2026.
Construction cost
15.8–20.1 M ₽
on average 61 800 ₽ per m²
| Foundation: monolithic slab | 2 559 000 ₽ |
| Walls and floors | 2 794 000 ₽ |
| Roof | 1 862 000 ₽ |
| Windows and front door | 2 081 000 ₽ |
| Insulation and facade | 1 702 000 ₽ |
| Utilities: wiring, heating, plumbing | 3 143 000 ₽ |
| Interior finishing | 3 841 000 ₽ |
Guide price based on average contractors. The exact estimate depends on the plot, soil and chosen materials.
What the plan includes
- Architectural section: floor plans, elevations, sections, roof plan, window and door schedules
- Structural section: foundation, walls, floors, rafters, details
- On request: engineering sections, layout changes, mirrored version
We deliver the project electronically within 1–3 days after payment; the paper set is shipped by a transport company. We’ll confirm the exact contents before payment.
Similar plans
Build ≈15.8–20.1 M ₽
Calculate