Two-storey timber-frame house 68 m², 6.2×8.5 m
Timber frame2 floorsterrace

Specifications
Total area68 m²
Floors2 floors
Wall materialTimber frame
Dimensions6.2 × 8.5 m
Terraceyes
Plot widthfrom 13 mwith 3 m setbacks
How much it costs to build this house
Calculate it yourself: choose the plot location, foundation and construction stage. Primorye builders’ prices, November 2026.
Construction cost
3.5–4.5 M ₽
on average 59 200 ₽ per m²
| Foundation: monolithic slab | 422 000 ₽ |
| Walls and floors | 762 000 ₽ |
| Roof | 326 000 ₽ |
| Windows and front door | 486 000 ₽ |
| Insulation and facade | 398 000 ₽ |
| Utilities: wiring, heating, plumbing | 734 000 ₽ |
| Interior finishing | 898 000 ₽ |
Guide price based on average contractors. The exact estimate depends on the plot, soil and chosen materials.
What the plan includes
- Architectural section: floor plans, elevations, sections, roof plan, window and door schedules
- Structural section: foundation, walls, floors, rafters, details
- On request: engineering sections, layout changes, mirrored version
We deliver the project electronically within 1–3 days after payment; the paper set is shipped by a transport company. We’ll confirm the exact contents before payment.
Similar plans
Build ≈3.5–4.5 M ₽
Calculate
